Fairfield Ledger
https://fairfield-ia.villagesoup.com/p/1760303

Mt. Pleasant News   Wash Journal
Neighbors Growing Together | Sep 22, 2018
IOWA NEWS

Work on U.S. 218 now rescheduled to July 9

Jun 29, 2018

MT. PLEASANT -- Due to recent rains and anticipated rainfall, the planned closure of the roadway and bridge over the Skunk River on northbound U.S. 218 between Henry County Road J-20 and River Road near Salem will now occur from 6 a.m. to 6 p.m. July 9, weather permitting, according to the Iowa Department of Transportation’s Mt. Pleasant construction office.

The bridge closure and signed detour are expected to be in place for 12 hours. Motorists will be directed around the work zone using the signed detour route which includes Henry County Road J-20.

Local traffic along U.S. 218 will have access to U.S. 218 except for the northbound lanes crossing the bridge over Skunk River.

The Iowa D.O.T. reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through the 511 system. Visit 511ia.org; call 511 within Iowa or 800-288-1047 nationwide; stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to a mobile device.

To receive email or text alerts about traffic incidents, road closures, traffic delays, and other restrictions that affect this highway route or other traveled routes, the Iowa D.O.T. offers the “Your 511” option on 511ia.org. Visit https://iowadot.gov/511/511-full-feature-website-help/how-to-videos for simple, step-by-step instructions to sign up.

Comments (0)
If you wish to comment, please login.